General

  1. SCCS have appointed a contractor to build their new facility in Cambridgeshire.

    The new building has been designed for a centrally located logistics team, to include hire, sales, administration, repair and training. Paul MacArthur Group Managing Director of SCCS added. 'I am delighted to have this project underway. We have designed a space to future proof our growth plans. This will allow us to provide a core distribution centre and full training...
  2. New Leica Nova MS50 MultiStation Overview Video

    The new MS50 MultiStation from Leica is set to revolutionise the world of geospatial data capture. The MS50 brings together precise 3D terrestrial laser scanning, precision 1" total station capability, digital imaging with elements of photogrammetry, and GNSS connectivity. This advanced measuring functionality and huge range of applications is easy to use and provides a unique solution in the market...
  3. London surveying community gathers for annual London Survey Dinner

    November 2013 saw the annual London Survey Dinner hosted by SCCS – The Survey Equipment Company. The event saw 120 leading members of greater London’s geospatial community past and present gather at the Dover Street Restaurant in Mayfair for a reception, networking dinner and awards presentation. Within a lively atmosphere of chatter and live music the invited guests enjoyed drinks...
  4. SCCS Annual Survey Dinner Success

    Following the huge success of the inaugural Survey Dinner in 2012 SCCS are hosting the second London Survey Dinner in Mayfair. Last year esteemed friends and colleagues of SCCS joined together to share a fun filled night with good food, great music and lots of fun. The London Survey Dinner will again be held at the highly rated Dover Street...
  5. SCCS support BAM on Acton dive-under project for Network Rail

    Eaton Socon 16th October 2013 – SCCS has again supported a key client with on-site support and consultation. BAM engineers called on Tom McCarthy, Project Support Engineer at SCCS to investigate inconsistent results while monitoring of the existing track with a Leica TS15 total station. After observation of workflow and discussion with BAM staff advice was offered regarding the way...

Items 171 to 175 of 214 total