Amberg SlabTrack
394.3 km/h? No problem!
Integrated surveying solution optimised for the typical requirements during construction, monitoring and maintenance of slab track lines
- High-precision systems optimally support the different slab track construction stages
- Real-time display of correction values for direct adjustment of track position and height
- Interactive, sleeper-based correction-data preparation
- Acceptance mode for proper documentation of final track position
- Comprehensive numerical and graphical reporting as a hand-out for contractors
Measurement system
- High-precision geodetic 3D mode for construction, fine adjustment and acceptance
- High-speed long-chord mode optimised for regular maintenance of existing slab track lines
- Long-chord mode supports Single CP mode for highest performance and Multi CP mode for highest reliability
- System configurations: GRP 1000, IMS 1000, IMS 3000
Software
- Simple management of project data including ability to handle evolving design data states
- Sophisticated editor for interactive correction-data preparation for each sleeper
- Export of a track correction list according to construction requirements
- Creation of required hand-outs for proper documentation of the final as-built slab track


London’s Silvertown Tunnel Project
Due to open in 2025, this infrastructure project is utilising the latest surveying equipment to ffficiently capture images and measure points. Learn More