Jump to content


View basket

Jagdberg Traffic Tunnel Case Study


Model: Jagdberg Traffic Tunnel Case Study
Ref Code:
Price POA
  Call Back

 

Jagdberg Traffic Tunnel Case Study Product Information

Efficient Tunnel Guidance thanks to TMS Solution
Germany‘s Largest Traffic Tunnel


Work on the Jagdberg Tunnel in Germany began at the beginning of March 2008, forming part of the six-lane A4 autobahn between Magdala and Jena/Göschwitz. It is currently the largest traffic tunnel construction project in the Federal Republic.

The ARGE Tunnelbau A4 (A4 Tunnelling Joint Venture) was responsible for implementing the €295 million Jagdberg Tunnel. Our experienced technology partner for surveying was Amberg Technologies: the excavation geometry of the twintube tunnel was determined with the aid of the powerful TMS software...

...Please open the pdf case study for full details.

...If you have any enquiries regarding rail or tunnel surveying, please contact us to discuss.

Shop Categories




SCCS Survey are a UK leading distributor of Leica Geosytems Surveying Equipment specialising in the sale, hire, repair and calibration of surveying equipment. SCCS Stock a large quantity of second hand survey equipment alongside our large catalogue of Leica products including: Leica total stations, Leica lasers, Leica Levels, Surveying Accessories, Laser Distance meters, Pipe lasers, Automatic levels, Dumpy Levels, GPS and surveying software.

Paul MacArthur Limited trading as SCCS – Registered office: hq1 Building, Phoenix Park, Eaton Socon, Cambs, PE19 8EP – Registered Number 05540080
All Prices Exclude VAT | * FREE Delivery to UK Mainland on orders over £150 exc. VAT